That 5.7kW the max then with two inverters, or can you max one out and continue on the other?
You'd never use 2-3 times it though would ya.
So then. How much was your electricity bill?
You should get standing charge rebates tbpfh. You were ready and able to export more renewable electricity to the grid but afaik renewable energy production fell in Q1 for blighty this year. The grid needs modernising to take advantage of all the good work people are voluntarily doing.the fact that the export reached its cap of 3.7 kW quite often resulted in the second inverter slowing its generation.
I have two standing charges for Leccy - we have an outbuilding with its own supply as it used to e a shopFuck me. My standing charge is 70p a day.
It's fucking daylight robbery.
Got an update and am pretty pissed off.
So as mentioned above the electricity meter is under the stairs and extremely difficult to get to, no problem, I go find my hammer drill and masonry drill bits and get to work.
Really? Fucking hell, if i hit the meter with a hammer a few times and say somehow I dropped a settee on it would that speed them up?
- Drill through an external wall with 22mm drill bit
- Drill through internal wall with 22mm drill bit
- At this point I have a cable route from meter/consumer unit to the outside world
- Slaps self on back thinking what a clever cunt I am and thinking Dad is with Mum saying "Pam look at Tony, I don't believe it", makes me smile lots
- Install trunking on wall which has been painted the same colour as the walls so it blends in
- After an initial survey I am tasked with contacting SSEN to get my main fuse rating
- Yesterday the contracted company by SSEN turns up, lovely chap, spend time talking
- Engineer pulls main fuse to get the rating, turns out it is 60A, too low, advises he cannot do anything else today and I need to contact my electricity supplier to change the meter for a new smart meter, my meter is the original one from when the house was built
- Ring my electrical supplier as SSEN won't touch anything after the main fuse
- Finally get through and fully explain the situation, guy places me on hold for 10 minutes to find a booking
- Guy comes back with a date, I sigh and ask him to check for any cancelled appointments
- 10 minutes later he gives me a date, the fucking 7th October 2025 for some engineer to come to my house and do a meter replacement along with 2 tails which go into my consumer unit
So today I will go back to the solar panel installers and break the bad news to them, the thing is the engineer who was here yesterday will be the one doing the kit upgrade next time, why the fuck do you not carry that equipment on your truck as you knew exactly why you were attending my house, it would have added 30 minutes at most to his job and he had pulled the fuse already, alas no I have to wait for October to come around and go through another power outage.
Um like I said the guy who did the survey was not an "emergency" engineer and if he had the bits on his van could have done the jobs within 30 minutes, but no, fucking twats will now make me wait for an eternity when it could have been solved yesterday. You might say oh he didn't know why he was coming to my house, but he did as I clearly explained everything over the phone and he knew the moment I opened the door to him.Not my job.
You could accidentally break shit and they'll put you further forward (but your big nose doesn't count as a disability so you won't be at the actual front) but then you're taking slots away from people that genuinely do have an emergency.
Um like I said the guy who did the survey was not an "emergency" engineer and if he had the bits on his van could have done the jobs within 30 minutes, but no, fucking twats will now make me wait for an eternity when it could have been solved yesterday. You might say oh he didn't know why he was coming to my house, but he did as I clearly explained everything over the phone and he knew the moment I opened the door to him.
Got an update and am pretty pissed off.
So as mentioned above the electricity meter is under the stairs and extremely difficult to get to, no problem, I go find my hammer drill and masonry drill bits and get to work.
Really? Fucking hell, if i hit the meter with a hammer a few times and say somehow I dropped a settee on it would that speed them up?
- Drill through an external wall with 22mm drill bit
- Drill through internal wall with 22mm drill bit
- At this point I have a cable route from meter/consumer unit to the outside world
- Slaps self on back thinking what a clever cunt I am and thinking Dad is with Mum saying "Pam look at Tony, I don't believe it", makes me smile lots
- Install trunking on wall which has been painted the same colour as the walls so it blends in
- After an initial survey I am tasked with contacting SSEN to get my main fuse rating
- Yesterday the contracted company by SSEN turns up, lovely chap, spend time talking
- Engineer pulls main fuse to get the rating, turns out it is 60A, too low, advises he cannot do anything else today and I need to contact my electricity supplier to change the meter for a new smart meter, my meter is the original one from when the house was built
- Ring my electrical supplier as SSEN won't touch anything after the main fuse
- Finally get through and fully explain the situation, guy places me on hold for 10 minutes to find a booking
- Guy comes back with a date, I sigh and ask him to check for any cancelled appointments
- 10 minutes later he gives me a date, the fucking 7th October 2025 for some engineer to come to my house and do a meter replacement along with 2 tails which go into my consumer unit
So today I will go back to the solar panel installers and break the bad news to them, the thing is the engineer who was here yesterday will be the one doing the kit upgrade next time, why the fuck do you not carry that equipment on your truck as you knew exactly why you were attending my house, it would have added 30 minutes at most to his job and he had pulled the fuse already, alas no I have to wait for October to come around and go through another power outage.
Um like I said the guy who did the survey was not an "emergency" engineer and if he had the bits on his van could have done the jobs within 30 minutes, but no, fucking twats will now make me wait for an eternity when it could have been solved yesterday. You might say oh he didn't know why he was coming to my house, but he did as I clearly explained everything over the phone and he knew the moment I opened the door to him.
I have gone for 10 panels @ 450W each with 8KW battery storage alongside a 5KW inverter. Fully networked so I can add it to my monitoring platform. Going to see if the install can be done in two parts, hook up the solar part so at least it is fully tested before those twats can do the tail and meter upgrade. Fingers crossed.I think your mother said "Pam look at Tony, I don't believe it, he isn't burning through as many masonry drill bits this time"
It is a mess and gets rather complicated at times, with no one trusting anyone until they see it. You got quite lucky to get one in 2 months, as there are massive staff shortages and thus long delays are common. I remember when our gas meter stopped transmitting its readings to the smart meter, and it took months before the supplier could get someone out to change what turned out to be the battery.
What are your actual solar plans then?
I have gone for 10 panels @ 450W each with 8KW battery storage alongside a 5KW inverter. Fully networked so I can add it to my monitoring platform. Going to see if the install can be done in two parts, hook up the solar part so at least it is fully tested before those twats can do the tail and meter upgrade. Fingers crossed.
Still rather new to all this, export maximum? Is this a figure my supplier will give me or the leftovers from my solar generation ? If the latter then I would say 0Nice, panels in South or East/West setup, export maximum?
This is the final technical diagram with the adjustments to limit export on the second inverter:
View attachment 50705
Still rather new to all this, export maximum? Is this a figure my supplier will give me or the leftovers from my solar generation ? If the latter then I would say 0![]()