Embattle
FH is my second home
- Joined
- Dec 22, 2003
- Messages
- 13,814
- Thread starter
- #271
Got the installers back tomorrow to finish the networking of the solar system, I made a fuckup on the day and it failed but I have tested the new SSID/VLAN using a phone and a laptop and all good.
Cannot remember if I mentioned it but with my install the whole house is basically on a UPS now with zero outage failover. That will be properly tested when the dumb meter is swapped out for a smart meter in October. When the system is fully networked I can then check on the runtime based on load and I suspect I will be purchasing more batteries.
More news tomorrow after they have been and gone along with, hopefully, some nice images.
Good stuff, nice images should also show what you've got