Hawkwind
FH is my second home
- Joined
- Jul 5, 2004
- Messages
- 7,541
Aircraft (A340-600) in the pictures below was on the FAL (Final Acceptance Line) at Airbus Toulouse. It is believed they were conducting a Full Engine Run Test where you park the aircraft, put breaks on with chucks under the wheels and then apply full thrust to each engine. Then full power on all four engines. The BITE (Built in Test Equipment)/HUMs (Health Usage Monitoring) data is then collected and checked to make sure all the Engines are 100% good. No vibration etc.
This one managed to somehow jump over the chucks and brakes did not hold it. It then picked up speed and crashed into the safety barriers. It was only 2-3 days away from customer acceptance and handover.
Reports between 5-9 people injured, mostly Etihad personnel. Guess the French Engineers were the first to run clear
This is the second A340 accident this week at Airbus, not good for the share price.
This one managed to somehow jump over the chucks and brakes did not hold it. It then picked up speed and crashed into the safety barriers. It was only 2-3 days away from customer acceptance and handover.
Reports between 5-9 people injured, mostly Etihad personnel. Guess the French Engineers were the first to run clear
This is the second A340 accident this week at Airbus, not good for the share price.