Tom
I am a FH squatter
- Joined
- Dec 22, 2003
- Messages
- 17,378
I have just ordered one of these:
Ribble 7005 Winter/ Trainer/Audax Review - BikeRadar
I can't fucking wait. Hopefully shouldn't take more than 2 weeks to be built, at which point I get to ride it the 30 miles from the shop to my house![Smile :) :)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
Ribble 7005 Winter/ Trainer/Audax Review - BikeRadar
I can't fucking wait. Hopefully shouldn't take more than 2 weeks to be built, at which point I get to ride it the 30 miles from the shop to my house